Helical piles
H114 Helical Pile
House foundations, extensions and relocated homes.
- New houses
- Extensions
- Relocated homes
Install
Auckland · Waikato · Bay of Plenty
Engineered steel screw piles for houses, decks, tiny homes and sheds. No digging, no concrete trucks and nothing to cure, so you can build on them the same day.
Install log · Pile 07
Target torque reached. Ready to build on.
Why screw piles
A screw pile is a steel shaft with helix plates near the tip, screwed into the ground until it reaches firm soil. It does the same job as a bored concrete pile, minus the digging, the mess and the wait.
Nothing to cure. Piles carry load the moment they're in, so framing can start that afternoon.
No holes, no muck to cart away and no wrecked lawn. A small rig and a crew of two.
No holes to flood and no pour to postpone. Wet weather rarely stops an install.
Bolt-on extensions take piles down to firm ground. No benching, no boxing.
Installation torque shows what each pile can carry, and we log it pile by pile for the engineer.
They unscrew the way they went in, leaving no lump of concrete behind.
What we pile
Engineered piles in place of bored concrete, with PS1 and PS3 for council.
How it worksTight access, next to existing foundations, with no spoil to cart through the house.
How it worksPiles ready the day before the house arrives, and removable if it moves again.
How it worksThe natural partner for Hari Tiny Homes and 70m² builds.
How it worksGround screws in a morning, with no holes and no concrete bags.
How it worksA level base on any section, even sloping or soggy ones.
How it worksPortal frames, canopies and Kiwi Steel Frames builds.
How it worksPosts that go in fast and line up perfectly.
How it worksEngineered support for walls and sinking foundations.
How it worksHow it works
Call, email or send your estimate. Plans help, but a sketch with dimensions is fine to start.
We look at access, ground and underground services, and confirm the right pile for the job.
For consented work, the engineer designs the layout and target torque and issues a PS1.
Set-out, then each pile screwed to target torque and cut to level, with depth and torque logged.
The torque record and PS3 go to you and the engineer, and your builder starts straight away.
The range
Helical piles
House foundations, extensions and relocated homes.
Install
Helical piles
Made for tiny homes, granny flats and sleepouts.
Install
Ground screws
The all-rounder for decks, fences, sheds and signs.
Supply Install
Heads & caps
Level the bearer on site with a spanner.
Supply Install
Side by side
| Compared | Screw piles | Bored concrete piles |
|---|---|---|
| Typical house install | 1–2 days | 2–4 days, plus curing |
| Build on it | Same day | Once the concrete has cured |
| Digging & spoil | None | Every hole dug, spoil carted away |
| Wet weather | Install in the rain | Holes flood and pours get postponed |
| Soft or sloping ground | Go deeper with extensions | Deeper holes, casings, more concrete |
| Capacity check | Torque logged for every pile | Hole inspected before the pour |
| On site | Small rig, crew of two | Digger, concrete truck or pump |
| Later on | Unscrew and reuse | Concrete stays in the ground |
One yard, the whole build
Kiwi Screw Piles shares a yard and a team with Kiwi Steel Frames, Hari Tiny Homes and Pro Windows & Doors. So the piles, the frame, the home and the joinery can all come from people who work together every day, with one point of contact and nothing lost between trades.
More about us
Aluminium joinery, OMEGA fabricator
Tiny homes and granny flats up to 70m²
Light-gauge steel frames, made in NZ
Tell us what you're building and where. We'll come back with a quote, usually within a working day.